Editors note: On October 21, 2025 Northern States Power Company-Wisconsin, doing business as Xcel Energy opened a docket case with the Public Service Commission of Wisconsin for their application of Convenience and Necessity to Construct the Ten Mile Creek Solar Project and Gen-Tie Line, to be Located in St. Croix County, Wisconsin. The docket number is 4220-CE-190.
Below is a short tutorial on how to sign up for updates on this project.
Use the link provided below to subscribe to the Ten Mile Creek Solar project documentation on www.psc.wi.gov
By subscribing, you’ll automatically receive an email anytime a document related to this project is updated. This way, you don’t have to manually check periodically for updates and sift through it all.
Here are the steps:
1) Go to this web site https://apps.psc.wi.gov/ERF/ERF/ERFhome.aspx
2) Fill out the section of the screen that is circled pictured below – be sure to enter YOUR email address

3) Click on ‘Send Code Now ‘
4) Open another browser window to check your email or go to your email app for a one-time response from the PSC site – the email contains the ‘code’
Here is what my email looked like – YOURS will have a DIFFERENT code

5) Enter the one-time code back on the PSC web site to submit your subscription request
6) You are subscribed !

This tutorial was created by David Meyer.